Anfield Energy Inc. completes 12 holes of a 20-hole, 8,000-foot confirmation drill program at JD-7 mine in Colorado. Significant intercepts include 5,190 ppm (0.519%) eU3O8 in Hole JD7-25-004B. CEO Corey Dias pleased with results, aligning with company strategy. Remaining holes to be completed soon for future development plans.

Drilling at JD-7 mine started on September 15, 2025, with initial results showing elevated uranium mineralization in 10 of 12 completed drill holes. Robust uranium mineralization across targeted areas, with high-potential zones and moderate mineralization identified. Data supports future mine planning and resource modeling at JD-7.

Cored intervals in two drill holes aim to obtain physical samples of mineralized material for analysis. Split-barrel core drilling used, with samples to be analyzed by Pace Analytical and Hazen Research labs. Data will refine uranium and vanadium resource estimates for JD-7 lease, supporting project progression towards production readiness.

Read more at GlobeNewswire: Anfield Provides Positive Update Regarding its Confirmation