NexGold Mining Corp. announces additional results from diamond drilling program at Goliath Gold Complex, focusing on Goldlund Deposit. Drill holes aim to infill and expand open pit mineral resources. Selected intercepts include up to 64.10 g/t gold over 0.9 metres. Results support continuity of mineralization at depth for future resource expansion.

Kevin Bullock, President and CEO of NexGold, expresses confidence in gold mineralization continuity at deeper levels of Goldlund Deposit. Results will optimize Goliath Gold Complex, including Goldlund Deposit. Mineralization remains open along strike and at depth, providing potential for future resource expansion and follow-up targets.

Mineralization at Goldlund Deposit characterized by quartz stockwork veining within granodiorite sills. Zone 4 features wide intervals of mineralized volcanic rocks with intrusions. Drill holes improve geological model and enhance Mineral Resource confidence for future estimates. Results support grade continuity and potential for resource expansion in future.

NexGold implements QA/QC program for sampling and analysis, following CIM Exploration Best Practices Guidelines. Drill core split for analysis at Activation Laboratories in Ontario. QA/QC includes blanks, standards, and duplicates for quality assurance. Gold analysis conducted by fire assay and atomic absorption. Check assays run at secondary ISO certified laboratory.

Paul McNeill, VP Exploration of NexGold, serves as Qualified Person for NI 43-101 compliance. NexGold is a gold-focused company with assets in Canada and Alaska. Projects include Goldboro Gold Project in Nova Scotia and Goliath Gold Complex in Ontario. Company is committed to sustainable practices and community engagement throughout project life.

Read more at GlobeNewswire: NexGold Intersects 9.30 g/t Gold Over 11.0 Metres and 2.31