Aya Gold & Silver Inc. announced record quarterly production, recoveries, and throughput at its Zgounder Silver Mine in Morocco for Q3-2025. Silver production reached 1.35M ounces, a 29% increase from Q2-2025, with an average head grade of 146 g/t Ag and 92.5% recovery. The Corporation aims to sustain momentum into 2026 with operational optimizations.

During Q3-2025, underground development and stope sequencing supported a 1,276 tpd mining rate at 158 g/t Ag. Open-pit operations focused on stripping the northeast section, with equipment arriving in Q4 to boost ore production. Record throughput and recovery at the processing plant were achieved through improved blending and circuit optimization.

Aya expects continued operational improvements in Q4-2025, with the mill running above 3,700 tpd and recoveries maintained above 90%. With over 150,000 tonnes of stockpiled ore, Zgounder is well-positioned for year-end. The Corporation remains focused on maximizing cash flow and advancing its growth pipeline, including the Boumadine preliminary economic assessment.

Aya will release its Q3-2025 results on November 11, 2025, with a conference call at 10 a.m. Eastern Time to discuss financial and operational results. Participants can join via webcast or dial-in. The webcast replay and presentation slides will be available on Aya’s website post-call. Raphael Beaudoin, P. Eng, Vice-President, Operations, serves as the Qualified Person for the technical information in the press release.

Aya Gold & Silver Inc. is a Canada-based silver producer operating in Morocco. The only TSX-listed pure silver mining company, Aya focuses on maximizing shareholder value through sustainability in operations, governance, and financial growth. For more information, visit Aya’s website or contact the Corporation directly for inquiries about their operations and growth plans.

Read more at GlobeNewswire: Aya Gold & Silver Reports Q3 Record Production of 1.35M oz