Imperial Metals Corporation reports that the 2025 metal production from Mount Polley mine exceeded targets, with 30.715 million pounds of copper and 37,555 ounces of gold produced. The majority of mill feed in 2026 will come from the Phase 5 pushback in the Springer Pit. Exploration at Mount Polley yielded significant results, such as drill hole C2-25-123 intersecting 82.5 meters grading 0.45% copper and 0.88 g/t gold. The next phase of diamond drilling will follow up on these results. Red Chris mine production for 2025 will be released later. Imperial is a Vancouver-based exploration, mine development, and operating company with various holdings in British Columbia.
Read more at GlobeNewswire: Imperial Provides Update on Mount Polley 2025 Production
